World News

The Janen’s Germany’s Germany’s visit includes shipping tours such as Canadian shops for mobile SUBS

As he brings a hard seller in the spring to buy his roads, Oliver Burkhard, German Thysskrup Marine Systems (TKMS).

The Canada would be part of ‘family,’ she said.

We will – maybe – they are soon to find a better feeling that such a Music Pary Carney and German main members, Berlin business leaders before traveling the navy.

The Premier will meet Banity Friedrich Merz and Siswibo to participate in the business surrounded by the purpose of relieving Canada’s trade and joint venture.

Germany – Combined, integrated Norway 212cd combined is probably very amazing and mostly relevant to underground contractors’ contract reform. (Thyskrupprup Marine systems)

However, like many of these trips of his trip to this week, the issues of defense and safety are near Carney’s agenda.

In the top poles, multibillion gambling to replace Canada – and poor – Victorian-class ships, combined in German, perhaps the traditional order of opponents.

The final spring of Ottawa Arms Expo Canosec, Burkhard, Wartkhard, Wartinin DEPRIEF OFFERN German and Norwegian Toptre All CBC matters to discuss the TKMS government.

The basement of the land of water and more people.
The SUBRARINES in the Royal Canadian in Canadian old age, Canada seek applications from forms of transportation for the first AVATION. (Andrew Vaughan / The Canadian Press)

SHIPYARDSS in South Korea, Sweden and Spain and respond to information requests.

Germany and Norway, however, has been involved in their construction integration program.

Canada wants to buy Domani Domavines assigned to 12 meeting.

The 212CC form is based on a well-established German design program 212A Design, which is used by German and Italian Navis.

Store, Director of Norway of Subnmentines, said 212cd (CD referred to normal formulation) is designed to work on all OCEANS, especially the Arctic.

It was a need for Norwegian Arctic country. With its independent Air-private system, Diesel’s electrical ferry can last under three weeks, Tocken Consistent.

It’s a big ferry – 73 meters in length, 2,800 tons when installed and with eight torpedo tubes.

The first order of $ 8.1 billion (5.5-billion euro) were 212cds – two in Germany and four NEWAY. Each country is now planning to build a lot, to bring a complete order until 12 boats.

German Navy will first receive its 212cd in 2028 and Norwegian is expected to be in the water next year.

TKMS Pitch also includes a system of building in Canada, creates Canadian activities – an important state of free government.

Burkhard, who praised the German and Norway according to the Praka-Cautor’s First Coza Coza Norada.

Access to the production line at this time can include reorganizing one of the missing ships or Norway.

“I think there are opportunities for us if it is one of those who probably first Canada,” Burkhard told CBC news.

Although, he said, depending on the Canadian government and how quickly it goes.

Carney suggested that government would like to have a decision in a Marine project in 2027.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button